Major equipment of the power project comprises a 50 tonne per hour (TPH) capacity single drum travel grate type boiler. The average inflow of extraction steam is 30 tonnes per hour, which is used for process steam requirements in the paper machine section.

Category: ,

Description

SPIL has implemented a 5 MW cogeneration power project based on rice husk. The power will be produced by a 5MW extraction-cum-condensing steam turbine with an alternator. Major equipment of the power project comprises a 50 tonne per hour (TPH) capacity single drum travel grate type boiler. The average inflow of extraction steam is 30 tonne per hour, which is used for process steam requirements in the paper machine section. In pre project scenario the heat and power requirement was met using low-pressure boiler with 3 MW turbine, wherein the remaining power is imported from grid. The GHG emission reductions are from electricity generation. It would substitute electricity generation of the NEWNE grid of India, dominated by coal-based power plants, and thus would reduce coal consumption.

Project information: https://registry.verra.org/app/projectDetail/VCS/1547

Buy to Cancel or Retire. Minimum purchase of 10 tonnes. So that we may send you your Offsetting Certificate, we will require information on your  cancellation reasons and ‘beneficiary’ details as per the below;

  • Company or Individual Name to be entered into the Certificate:
  • Cancellation / Retirement Reason: Eg. ‘Voluntary offset of business activities for ABC Travels for “fuel, expeditions, operations, ground transport, manufacturing or back office”.  You can choose whichever activity you wish to offset, or offset all.

Email us the above information at operations@shipcarbon.com and we will complete the Cancellation / Retirement on your behalf and email you the certificate.