Hydropower Plant – Republic of Korea – UN CER’s

$11.10

This well-managed landfill is owned and operated by the host-country project participant CDR Pedreira – Centro de Disposição de Resíduos Ltda. and it is located in the city of São Paulo, the capital city of the State of São Paulo.

Category: ,

Description

The project will produce electricity from renewable energy and displace electricity from
the EPG that is supplied by several fossil fuel-fired generating units. The project activity will install a new
power plant at the site where there was no renewable energy power plant operating prior to the
implementation of the project plant (Greenfield plant). The project activity results in a new reservoir of 2.3
km2 and the power density is 4.3 W/m2
, which is greater than 4 W/m2
. The capacity of the proposed
project will be 10 MW within the threshold capacity of 15 MW. The electricity generated by the Project
will be transmitted to the EPG through the Jongpyong Substation.

Project Information: https://cdm.unfccc.int/Projects/DB/CEC1331622653.28/view

 

Buy to Cancel or Retire. Minimum purchase of 10 tonnes. So that we may send you your Offsetting Certificate, we will require information on your  cancellation reasons and ‘beneficiary’ details as per the below;

  • Company or Individual Name to be entered into the Certificate:
  • Cancellation / Retirement Reason: Eg. ‘Voluntary offset of business activities for ABC Health Centre Practice’

Email us the above information at operations@shipcarbon.com and we will complete the Cancellation / Retirement on your behalf and email you the certificate.